Marathon Sprint Series Instrukcje Operacyjne Strona 16

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 15
Installation duo
15
Installation option A/B
Choose a suitable location for the installation of the control housing
(1), preferably near a power socket (3).
Minimum height from the floor: 1,6 m.
Please note when selecting location of control unit housing (1)
that the maximum length of the control cable (2) is 6900 mm and
no longer!
Install the control line (24 V) (2) to the control housing (1) in the
garage. Do not yet plug in the power plug (4)!
Mark fixing points horizontally 110 mm apart on the wall. Drill two
holes (Ø 10 x 65 mm). Insert wall plug (1) into the holes in the wall.
Be careful not to drill into the socket outlet feeder and do not
plug the mains plug in yet!
Loosen the strain-relief (1) device at the rear of the control unit.
Insert the end of the control cable (2) into the rear of the control unit
(1). Use the strain-relief (1) device to protect the power cable (3) and
control cable (2).
Connect the control cable (2): connect the core marked 3 (green) to
terminal 3 and the core marked 4 (red) to terminal 4 of direct socket
unit (1). Shorten the control cable (2) if necessary.
In the case of swing doors, connect wire marked 3 (green) to
terminal 4 of the direct socket unit (2) and the one marked 4 (red)
to terminal 3.
Secure the control housing (1) to the wall, using the two screws (2).
Align the control housing (1) and secure it with screws.
27
26
2726
2
1
2
1
1
2
3
4
5
6
3 4
1
2
3
4
5
6
25
24
25
ca 150
2
1
3
4
24
110
1
23
4
4
4
3
3
3
1,6m
2
1
A23
`
2
3
A
B
`
½
B23
`
,1
2
3
4
6
`
m
°
1,6m
`
,1
2
3
4
6
`
m
°
2
`
,1
2
3
4
6
`
m
°
3
`
,1
2
3
4
6
`
m
°
3
`
,1
2
3
4
6
`
m
°
4
`
,1
2
3
4
6
`
m
°
4
`
,1
2
3
4
6
`
m
°
3
`
,1
2
3
4
6
`
m
°
4
`
,1
2
3
4
6
`
m
°
1
Slot the control board (1) into terminal bar (2) and slide it into the
housing.
Mount the lamp hood (2) and tighten the screw (3).
Installation option C
Choose a suitable location for the installation of the control housing
(1), preferably near a power socket (3).
Please note when selecting location of control unit housing (1)
that the maximum length of the control cable (2) is 6900 mm and
no longer!
Install the control line (24 V) (2) to the control housing (1) in the
garage. Do not yet plug in the power plug (4)!
Drill 4 holes (Ø 6 x 40 mm deep). Place plugs (2) in holes. Included
in delivery. Supplied components 2 plugs, 2 screws.
Be careful not to drill into the socket outlet feeder and do not
plug the mains plug in yet!
Loosen the strain-relief (1) device at the rear of the control unit.
Insert the end of the control cable (2) into the rear of the control unit
(1). Use the strain-relief (1) device to protect the power cable (3) and
control cable (2).
Connect the control cable (5): connect the core marked 3 (green) to
terminal 3 and the core marked 4 (red) to terminal 4 of direct socket
unit (2). Shorten the control cable (5) if necessary.
In the case of swing doors, connect wire marked 3 (green) to
terminal 4 of the direct socket unit (2) and the one marked 4 (red)
to terminal 3.
26
25
26
5
2
1
2
3
4
5
6
3 4
1
2
3
4
5
6
5
5
7
7
8
8
4
4
6
6
3
3
2
2
1
1
ON
ON
DIP
DIP
2
2
3
3
4
4
5
5
6
6
1
1
1
25
ca 150
2
1
3
4
24
23
H
1
2
3
4
23
24
3
2
4x
29
28
29
2
3
1
28
2
1
2
3
4
5
6
3 4
1
2
3
4
5
6
5
5
7
7
8
8
4
4
6
6
3
3
2
2
1
1
O
N
ON
D
IP
DIP
2
2
3
3
4
4
5
5
6
6
1
1
1
Przeglądanie stron 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 34 35

Komentarze do niniejszej Instrukcji

Brak uwag